Viewing 7 results ...

Ajayi, S O, Oyedele, L O, Kadiri, K O, Akinade, O O, Bilal, M, Owolabi, H A and Alaka, H A (2016) Competency-based measures for designing out construction waste: Task and contextual attributes. Engineering, Construction and Architectural Management, 23(04), 464-90.

Carbonara, N, Costantino, N and Pellegrino, R (2016) A transaction costs-based model to choose PPP procurement procedures. Engineering, Construction and Architectural Management, 23(04), 491-510.

Ho, P H K (2016) Labour and skill shortages in Hong Kong’s construction industry. Engineering, Construction and Architectural Management, 23(04), 533-50.

Loosemore, M and Lim, B T-H (2016) Intra-organisational injustice in the construction industry. Engineering, Construction and Architectural Management, 23(04), 428-47.

Lu, W, Zhang, L and Bai, F (2016) Bilateral learning model in construction claim negotiations. Engineering, Construction and Architectural Management, 23(04), 448-63.

  • Type: Journal Article
  • Keywords: Bayesian learning; claim negotiation; discount factor; risk attitude; zeuthen strategy
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-04-2014-0062
  • Abstract:
    Purpose - The learning ability on critical bargaining information contributes to accelerating construction claim negotiations in the win-win situation. The purpose of this paper is to study how to apply Zeuthen strategy and Bayesian learning to simulate the dynamic bargaining process of claim negotiations with the consideration of discount factor and risk attitude. Design/methodology/approach - The authors first adopted certainty equivalent method and curve fitting to build a party’s own curve utility function. Taking the opponent’s bottom line as the learning goal, the authors introduced Bayesian learning to refine former predicted linear utility function of the opponent according to every new counteroffer. Both parties’ utility functions were revised by taking discount factors into consideration. Accordingly, the authors developed a bilateral learning model in construction claim negotiations based on Zeuthen strategy. Findings - The consistency of Zeuthen strategy and the Nash bargaining solution model guarantees the effectiveness of the bilateral learning model. Moreover, the illustrative example verifies the feasibility of this model. Research limitations/implications - As the authors developed the bilateral learning model by mathematical deduction, scholars are expected to collect empirical cases and compare actual solutions and model solutions in order to modify the model in future studies. Practical implications - Negotiators could refer to this model to make offers dynamically, which is favorable for the parties to reach an agreement quickly and to avoid the escalation of claims into disputes. Originality/value - The proposed model provides a supplement to the existing studies on dynamic construction claim negotiations.

Manley, K and Chen, L (2016) The impact of client characteristics on the time and cost performance of collaborative infrastructure projects. Engineering, Construction and Architectural Management, 23(04), 511-32.

Upstill-Goddard, J, Glass, J, Dainty, A and Nicholson, I (2016) Implementing sustainability in small and medium-sized construction firms: The role of absorptive capacity. Engineering, Construction and Architectural Management, 23(04), 407-27.